After the concrete is all ready, the sole plates are then joined together with the anchor plates which protrude out of the foundation. Use the carpenter’s pencil and measuring tape to mark about one and a half inches from the board end continually every sixteen inches till the further end. These marks guide where the studs will be placed. Mark where the anchor and the mudsill meet up with a different marker from the one used initially. The studs are then taken and galvanized nails are driven through the marked areas into the center of the board until they reach the stud bottom. The studs should be secured to the baseboard.
The front wall has a 6-foot-long top plate and two 1-foot-long bottom plates, leaving space for a 4-foot-wide door. The four wall studs are 81 1/4 inches long; install them as shown in the front framing detail at left. Next, install the 73-inch-long jack studs, and then attach the 51-inch-long doubled header. Finally, attach the 6 1/4-inch-long cripple studs.
The toughest and most important part of building a shed is finding the right plans. Sure you can just start building without plans, but do you know how it will look when you are done? Or you can search for free plans, but are they designed right? What I recommend is finding plans, even if it means you have to pay a little. Make sure that sample plans are provided so you know what you are getting. Do not make a purchase just because they show lots of nice sheds but no sample of the actual plans you will be buying. Look for the following before you decide to purchase:
The Dip treated sheds are made of components which are usually lowered into the tanks of preservatives even before the panels are assembled. This is a low-cost process that can be done simply, and also it encourages the manufacturers to use a wide variety of treatments making the shed types available for the DIYers. There are recognisable given that they usually come in golden brown due to the preservative dye that is added. Most of the manufacturers offer you around 10-year guarantee on dip treated sheds along with anti-rot treatment, but one has to recoat every year or the alternative year.​
For a freestanding shed, you can build the shed on top of a concrete slab (see Pouring a Concrete Slab) instead of the pressure-treated skids and floor joists; this will actually result in a sturdier—more permanent— structure. Otherwise, for a freestanding shed, the foundation should be constructed on concrete piers or poured footings (see Pouring Concrete Footings & Piers).  Be aware that building on footings will raise the height of the shed up from the ground.
If you have the do-it-yourself skills and an open timeframe, check out the various plans available online or for purchase. Make sure you thoroughly understand the instructions and actually have the ability and tools to do the job. Other sources for sheds include prefabricated buildings that you would order from a reputable company and kits. Some include pre-cut lumber that is shipped to your house. Before ordering, find out if additional milling, drilling, or cutting will be needed, along with necessary tools.
A shed could double as a greenhouse, in which case you can use the shed plans provided on instructables. In this particular case, the shed was built out of old windows. An old window isn’t exactly something you can repurpose easily but here it’s a perfect fit. The first step is to gather enough windows. After that, it’s time to build the frame and you’ll need some wood for this part. Make sure the foundation is secure before you screw in the windows.
To be sure, the whole permitting process can be a bit intimidating. And, if I'm being honest here, I've never been comfortable dealing with the city and all their codes - seems they're always moving the line on me. But, I always make it a point to be friendly with the Building Inspector. He's there to help and can be a fountain of information, when building your wood shed.
The ad shows the bright shiny new 8x12 Gabled Shed. However, after purchase, that plan does not show up anywhere. I have emailed and requested that plan several times but no response. So, thanks to those who have already posted the 1-800-390-6035 number for ClickBank customer support. It's a chore to work with their VRU but with patience, you can get a refund.

Build the framework for all four walls. To account for the fact that the front and back walls are different from each other (due to the doorframe in the front) and the side walls must both be sloped (to prevent rain from collecting on the roof), each of these will have to be tackled somewhat differently. It’s easiest to construct the back first, the front second, and the two sides last, as shown in the numbered image below. See How to Frame a Wall for more information before you read the instructions below.[5]

Build the framework for all four walls. To account for the fact that the front and back walls are different from each other (due to the doorframe in the front) and the side walls must both be sloped (to prevent rain from collecting on the roof), each of these will have to be tackled somewhat differently. It’s easiest to construct the back first, the front second, and the two sides last, as shown in the numbered image below. See How to Frame a Wall for more information before you read the instructions below.[5]