We’ve simplified the door-hanging process by mounting the door to a 1-1/2-in.-thick trim piece and then screwing the trim to the wall. An easy way to mark and cut matching hinge recesses in both the door and the trim is to clamp the trim alongside the door, making sure it extends 1/8 in. beyond the top of the door. Then mark the hinge cutout on both the door and the trim at the same time.
Build rafters across the roof and separate them with blocking. These should overhang the walls of your shed for increased weather protection. Again, your measurements will be greatly simplified if you space the rafters the same way that you spaced your floor joists. When you’re done, attach pieces of blocking between each pair of rafters along the top plates.[10]
Ø Clay tiled sheds — as the name suggests, these are sheds that their roofs consist of clay tiles. The clay tiles make the wooden sheds look visually appealing. Nevertheless, one has to plan for the clay tiles from the foundation of the shed so that it can support the roof due to the bulkiness of the roof. The wooden walls need to be strong enough to support the roof. It would be advisable to hire an expert to install the clay tiled roof to avoid complications.
Victoria, Australia-based Archiblox designs and makes sustainable, prefabricated modular residential and commercial projects. This simple, straightforward, and modern structure can be used as a studio, office, guest house, or pretty much whatever you desire. Modules can be grouped together for larger spaces and are designed to subtly echo the geometrical arrangement seen in nature.
Each truss is made up of two 2 x 4 rafters and one 2 x 4 ceiling joist. The three boards are joined together with 1/2-in. plywood gussets. To speed up the assembly process, build all the trusses on the shed floor before erecting the walls. Start by cutting all the rafters to length with a 40° angle at one end of each. Cut 2 x 4s to 10 ft. long for the bottom chords of the trusses. Also, cut all of the plywood gussets.
Most homeowners barely have enough time to keep their homes in shape, never mind their sheds. Heck, I was supposed to paint our downstairs bathroom before the kids got out of school last month. I just picked up the paint yesterday. That's why it's smart to choose low-maintenance materials for your shed. You usually need to pay a bit extra for these, but they'll save you time and trouble in the long run.
The last project we want to share with you today is a greenhouse/ garden shed which we found on lizmarieblog. It’s really cute and inside you can find shelves, storage compartments and a bunch of other practical things. In addition to all that, this lovely shed even has a chandelier. It’s a decorative element and it really elevates the decor to a whole new level.
Build the framework for all four walls. To account for the fact that the front and back walls are different from each other (due to the doorframe in the front) and the side walls must both be sloped (to prevent rain from collecting on the roof), each of these will have to be tackled somewhat differently. It’s easiest to construct the back first, the front second, and the two sides last, as shown in the numbered image below. See How to Frame a Wall for more information before you read the instructions below.[5]
We assembled each layer with pocket screws before gluing the two layers together, but if you don’t own a pocket hole setup, you could simply screw through the overlapping boards instead. Complete the door frame. Then cut the 4 x 8-ft. grooved plywood to fit the lower recess, and cut a piece of 1/4-in. acrylic sheet to fit the upper recess. Secure the plywood and acrylic sheet with 1/2-in. x 1/2-in. moldings nailed to the inside. Sand the edges of the door flush.
The walls of the foundation have been created and the electrical is all set, now all that needs to be done is to fill the gaping hole in between them with limestone agrigate.  We also threw in some concrete paving stones that we had lying around because we don't plan on using them and we had already tried to give them away.  After the limestone is in place tamp it down by jumping on it and keep filling up any places that are no longer level.  After the entire base is filled with as much limestone as you can fit put a sprinkler on to soak it and set it for the next hour or so.  You may need to add a bit more limestone after this is done as well.
×